Realisations

Pedestrian bridge made of metal in Louvain-la-Neuve

Installation of a new pedestrian bridge over the Boulevard du Sud in Louvain-la-Neuve. Work involved laying the foundations, the earthworks, the in-filling work behind the abutments (using stabilised sand), bridge lighting and road signing.

Constructor(s): 
De Graeve
Developer: 
INESU-IMMO - Louvain-la-Neuve
Project duration: 
17/01/2011 to 25/04/2011