FLOREFFE - Line 130 Namur/Charleroi: demolition of the road bridge located at km 70,061 at "Maudit Tienne" and construction of a new overpass at km 70,073 in Floreffe.

The work covered:

  • the demolition of the existing bridge;
  • the construction of a new overpass with reinforced concrete abutments, and with beams of reinforced and pre-stressed concrete;
  • the associated roadworks;
  • remediation of the embankments.

 

Constructor(s): 
De Graeve
Developer: 
Infrabel Dir. Infrastructure & Achat
Project duration: 
04/08/2008 – 15/05/2009