SNCB bridge in Rhisnes

Partial demolition and reconstruction of the overpass located at km 55,673 on Line 161 Schaerbeek-Namur.

  • Demolition of the existing superstructure (composite deck made up of two metal girders linked together by a solid concrete slab).
  • Demolition of the abutments.
  • Construction of new abutments.
  • Installation of a new transom in reinforced concrete.
  • Construction of a new superstructure using prefabricated concrete slabs covered by a second layer of in-situ concrete. 
  • Road resurfacing.

 

Constructor(s): 
De Graeve
Developer: 
INFRABEL Liège
Architect: 
INFRABEL Liège
Project duration: 
01/08/2007 – 03/2008